To remove existing oil filled boilers and oil tank. Replace with fully condensing gas fired boiler system with designed and manufactured flue.
Upgrade controls to BMS Trend system complete with head end.
Install new heating distribution pipework throughout the school with new LST radiators.
Lag and isogenapak all pipework.
Upgrade existing gas supply line to the school.
Flush, clean and […]
Wentworth School
Commercial Scaffolding, Maintenence
Basildon & Thurrock University Hospital
Air Conditioning, Commercial Scaffolding, Electrical, Maintenence, Mechanical Engineering
To assist with high legionella readings at Hospital.
Various control measures implemented and temperatures recorded before and after works.
Removing dead legs from pipework
Lagging exposed pipework to increase temperatures
Replacing flexible hoses with hard tails
Balancing systems to maintain flow of water
Adapting pipework to maintain secondary returns
Installation of new isolation and balancing valves
Cleaning and chlorination of water systems
Maintaining and […]