This Is A Custom Widget

This Sliding Bar can be switched on or off in theme options, and can take any widget you throw at it or even fill it with your custom HTML Code. Its perfect for grabbing the attention of your viewers. Choose between 1, 2, 3 or 4 columns, set the background color, widget divider color, activate transparency, a top border or fully disable it on desktop and mobile.

This Is A Custom Widget

This Sliding Bar can be switched on or off in theme options, and can take any widget you throw at it or even fill it with your custom HTML Code. Its perfect for grabbing the attention of your viewers. Choose between 1, 2, 3 or 4 columns, set the background color, widget divider color, activate transparency, a top border or fully disable it on desktop and mobile.

Electrical

Havering Local Authority – Sanders Draper & Hacton Schools

, ,

Project Schedule
To run new H.W.S pipework throughout the school to every outlet, internally and on the roof.
P.I.B lagging to all exterior HTA pipework with trace heating.
Connect to existing plant after converting cylinder to a pressurised system.
Installation of fan convectors and associated builders works.
Installation of duct work and air handling in toilets.

Project Timescale
5 weeks

Project Value
£180K

Lambeth Living

,

Project Schedule
To change an existing 3 pipe communal system feeding 162 flats to a new 4 pipe system.
Upgrade the 162 residential flats with new heating systems.
Adapt the existing 4 communal boiler houses to implement the new system.
Test, chlorinate and flush all systems.
Box in and clad exposed pipework on exterior walls.

Project Timescale
6 months

Project Value
£1.3M

Basildon & Thurrock University Hospital

, , , ,

To assist with high legionella readings at Hospital.
Various control measures implemented and temperatures recorded before and after works.
Removing dead legs from pipework
Lagging exposed pipework to increase temperatures
Replacing flexible hoses with hard tails
Balancing systems to maintain flow of water
Adapting pipework to maintain secondary returns
Installation of new isolation and balancing valves
Cleaning and chlorination of water systems
Maintaining and […]